As of September 2, 2026, the housing and communal services of Poltava Oblast are reported to be 80% ready for the autumn-winter period. Relevant authorities have confirmed this information by releasing a new readiness report.
From the beginning to today
The housing and communal services of Poltava region are 80% ready for the autumn-winter period. Critical infrastructure facilities, including water supply and heating plants, are 70% equipped with backup power sources. The reserve of diesel fuel will allow generators at water supply and heating facilities to operate for three days.
додано новий звіт про готовність
Питання готовності Полтавщини до зими
3 of 3 events
the editorial blocs represented in the collected reporting
6 of 7 blocs are not represented in the collected reporting.