Storyline
From the beginning to today
Avarian recovery works are being conducted on Kapushanska Street in Uzhhorod, near house No. 149. As a result, traffic on this section of the road is disrupted. Normal traffic will resume after the works are completed.
1 of 1 events
the editorial blocs represented in the collected reporting
6 of 7 blocs are not represented in the collected reporting.