Storyline
From the beginning to today
Dnipro has announced a tender for the construction of a shelter for a medical center costing UAH 715 million. The project includes a diesel generator, two elevators, an oxygen supply system, and facilities for people with reduced mobility. Completion is scheduled for the end of 2027.
1 of 1 events
the editorial blocs represented in the collected reporting
4 of 7 blocs are not represented in the collected reporting.