Storyline
Construction work on the bridge over the Dniester began in the Moldovan part of the riverbed. By early September 2026, the construction of the technological bridge continued in Moldova.
From the beginning to today
2 of 2 events
the editorial blocs represented in the collected reporting
5 of 7 blocs are not represented in the collected reporting.