Skip to content

Event

EnvironmentKryvyi Rih

3 km of main water pipeline replaced with plastic pipes in Kryvyi Rih

In Kryvyi Rih, the replacement of 3.1 km of main water pipeline, serving 56,000 residents, is underway. The work is expected to be completed by the end of September to prepare the water supply system for winter conditions. The old pipeline, installed in 1959, has suffered significant damage due to corrosion and hydraulic shocks.

In brief

  • Serves 56,000 residents
  • Old pipeline installed in 1959
  • Work to be completed by the end of September
  • Pipeline damaged due to hydraulic shocks
Covered by 2 of 6 media groups
  • Budget 2 sources
  • Public money not in the collected reports
  • Media business 2 sources
  • Big capital not in the collected reports
  • Readers and grants not in the collected reports
  • Undisclosed not in the collected reports

No newsrooms from these groups in the collected reports: public money, big capital, readers and grants, undisclosed.

What are media groups?

Share of reports by media group
GroupShareCount
Budget
  • Newsroom 3
50%3 items
Media business
  • Newsroom 3
50%3 items

How we count media groups — Methodology

Who the outlets write for
  • community 4
  • region 0
  • country 0
  • world 0
Channels
  • Telegram 2
  • TV and radio 4

How we measure speed, distance and channels

Report an error

Comments

Loading comments…

Allow visit statistics? PostHog keeps them (EU servers) under a random browser id — no name, no account; kept for 12 months. Vercel Speed Insights measures page speed, with no id. The site works the same without. Details