Skip to content

Event

5 sources · updated 14h ago

EnergyKryvyi Rih

Kryvyi Rih modernizes main water pipeline in preparation for winter

In the Inhulets district of Kryvyi Rih, the modernization of the main water pipeline has been completed with the installation of 16 new 600 mm valves. This will improve the management of the water supply system and reduce the risk of water supply interruptions for 70,000 residents during the winter period.

  • 16 new 600 mm valves
  • Water supply for 70,000 people
  • Project with Solidaritеs International and AFD
  • Preparation for winter
  • Reduction of water supply interruption risks

5 sources2/7 blocsnot represented: public, commentators, oligarch-owned, official, anonymous

Share of reports by bloc
BlocShareCount
Independent83%5 items
State17%1 item

How we count blocs — Methodology

Report an error

The tone spread between blocs is 0.22: below 0.3, so the blocs' framing is not compared.

Comments

Loading comments…

Allow visit statistics? PostHog keeps them (EU servers) under a random browser id — no name, no account; kept for 12 months. Vercel Speed Insights measures page speed, with no id. The site works the same without. Details