Skip to content

Storyline

29 September – 5 Octoberended

StorylineTransport

Construction of a dock in Szczecin

Construction of a 240-metre dock is underway at a shipyard in Szczecin, where underwater joints are being welded in a special underwater tunnel. Recently, a concrete 'box' weighing 73,000 tonnes was lowered to the bottom of the Baltic Sea as part of this project.

  • 2 events
  • 2 sources
  • updated
Covered by 2 of 6 media groups
  • Budget not in the collected reports
  • Public money not in the collected reports
  • Media business 1 source
  • Big capital 1 source
  • Readers and grants not in the collected reports
  • Undisclosed not in the collected reports

Chronology

5 October

29 September

2 of 2 events

Allow visit statistics? PostHog keeps them (EU servers) under a random browser id — no name, no account; kept for 12 months. Vercel Speed Insights measures page speed, with no id. The site works the same without. Details