Skip to content

Storyline

29 September – 1 Octoberactive

StorylineEnergy

Emergency repair works on the water supply system

The case began due to emergency repair works on the water supply system at 40 Mstyslavska Street, scheduled for October 1. Additionally, on October 1, works were announced on the water supply system at Transportna and Odeska Streets, which include the replacement of a fire hydrant.

  • 2 events
  • 1 source
  • updated

Media groups not classified yet

Chronology

Today

29 September

2 of 2 events

Allow visit statistics? PostHog keeps them (EU servers) under a random browser id — no name, no account; kept for 12 months. Vercel Speed Insights measures page speed, with no id. The site works the same without. Details